Drawing No. 37 - Mechanical Arm Arrangement

This drawing is not in the OpenR2 reference repository and has not been published or put up for sale or auction in any form.  This drawing number is referenced by the front assembly drawing which suggests that the drawing is the master definition of the mechanical  arms.

"There was no Aluminum casting facility at Shepperton. We sub-contracted the  machining of the arms to a company called C&L Developments. It is possible that they had some kind of castings made but my memory is that they were machined from the solid." David Watling, Peteric Engineering (interview by Brandon Angler)


Formats

  • Pencil (?)
  • Dye Line (?)
  • Vellum (?)
  • Xerox (?)

Referenced by


References

  • Unknown

Tracings

Reply Oldest first
  • Oldest first
  • Newest first
  • Active threads
  • Popular
Like Follow
  • 5 mths agoLast active
  • 84Views
  • 1 Following